OUTOTEC OYJ PRESS RELEASE, MAY 24, 2007
Outotec has signed a contract with Sierra Rutile Ltd., a subsidiary of Titanium Resources Group Ltd., for the design and expansion of Sierra Rutile's land-based processing plants in Sierra Leone, Western Africa.
Outotec is working closely with Sierra Rutile Ltd. and is responsible for implementation of the entire expansion project.
The new addition will utilize concentrate from two existing dredges and concentrators. It will first be upgraded using Outotec Spirals and a FLOATEX® Density Separator, and then dried. The dried ore will be sent to the new mineral separation plant for production of final products using advanced HE Rare-Earth Roll Magnetic Separators and eForce® High-tension Electrostatic Separators.
Outotec's laboratories in Jacksonville, USA and Perth, Australia were involved in the extensive testing program and flowsheet design.
The expanded plant, with a design capacity of approximately 300,000 tpa rutile and 70,000 tpa ilmenite, is scheduled for completion in early 2008.
For further information please contact:
Outotec (USA) Inc.
John Elder, President
Tel. +1 904 353 3681
E-mail: psdsales@outotec.com
Outotec Oyj
Eila Paatela
Vice President - Corporate Communications
Tel. +358 20 529 2004, mobile +358 400 817198
E-mail: eila.paatela@outotec.com
DISTRIBUTION
Main media
www.outotec.com