Los Trigales is a Paraguayan business group dedicated to transport, construction and aggregates. They operate in Paraguay and other countries in the region and have the operational and technical capacity to carry out large-scale transport, construction and infrastructure projects.
The challenge the company faced was to sustainably and solidly increase their production of high-quality aggregates using technology that was also sustainable over time. This meant adding 80,000 tons to their current monthly production, which is 960,000 tons per year.
Metso Nordplant up and running in two months
Los Trigales needed a solution that provided confidence in a range of aspects, such as quality of the material produced, accessibility and immediacy of maintenance service, and a good annual production quota. After technical meetings with the company, the specialists at Metso determined that Metso Nordplant solution was the best fit for their needs and it would give them the most confidence to achieve their goals.
This plant was chosen because, among other things, it allows for the quickest installation and fit – and with one point of contact. Using a traditional model, the installation would take at least 6 months and would also required time to be invested in the design and implementation of the electrical, mechanical and civil works with more than one supplier. The Metso Nordplant, by contrast, is a “plug and play” solution, as Metso takes the project and delivers the plant in optimal operating conditions without any inconveniences.