Meeting varied aggregate requirements on schedule
Ravitej Projects has been undertaking different types of projects in the road sector, irrigation and the power sector. The many types of projects have required different raw materials, i.e. aggregates, and have also involved stringent deadlines with respect to the delivery of the project.
The only way for Ravitej to meet these challenges was to have the right equipment to cater to the varied requirements for the needed aggregates and strong production to finish the project on schedule. Mobility, specifically the ability to move production assets easily from one location to another, was also a key consideration for Ravitej Projects’ ability to keep up with delivery deadlines. With these requirements in mind, Ravitej opted for Metso’s Nordwheeler two-stage crushing and screening plants for the projects it has throughout India.
“Our relationship with Metso started way back in 2007, and today we have seven Nordwheeler plants from Metso. Metso has been a backbone for us over these years and we have always trusted Metso when the stakes are high. When we were awarded with this prestigious dam project in Telangana state, i.e. the Dindi Balancing Reservoir project, our requirements changed completely from our previous project, and we opted to go with Metso again.The purpose of the project is to store the backwaters of the Krishna River; the aim is to replace fluoride water with clean and safe drinking water and to irrigate 150 lac acres of land, which is one of the prime concerns of the Telangana Government,” stated Mr. P. Adinarayana, a Partner at Ravitej Projects Pvt. Ltd.