Metso Insights Case studies Mining and metals refining Availability increased by 31% with an upgrade to Symons crusher
Mining Metals refining
Sep 23, 2019

Availability increased by 31% with an upgrade to Symons crusher

Maintaining high equipment availability rates is crucial for any mine. For this reason, Codelco’s Division Andina needed to perform a crusher upgrade to their Symons crusher. This is the second upgrade for this customer – one of the most important mining sites in the region. It belongs to the state-owned company Codelco. To achieve the needed increase in availability, the equipment’s setting time was reduced, as were its bowl removal time and its adjustment ring removal time. These various upgrades have reduced maintenance times and, with it, injury risk – and have led to increased uptime.
Two men looking down at Symons crusher.

Upgrading crushers for higher uptime

Mining production rates have risen over the last few years, so it is necessary to maintain high equipment availability rates. In order to meet this challenge, it became important to upgrade the site’s crushers.

Division Andina, Codelco’s mining site in the mountain range of the Valparaiso Region, 80 km from Santiago, needed to increase its coefficient of performance in its tertiary and quaternary plants. Given this situation, there were two options: purchase new equipment or update the existing units.

The Symons 7’ crushers working at the client’s mining site belonged to the older generation of these machines, that is, machines installed prior to the 1980s. The main factors that affected the coefficient of performance of the mine’s ageing Symons 7’ crushers were:

A view to the center of a Symons crusher.
  • Stalling (mineral, iron, wood, etc., caught in its crushing chamber) and the fact that the units had to go into maintenance for long periods of time without warning; these issues ultimately led to lower production.

  • The time associated with operational adjustments to the equipment, such as its close setting, which had to be carried out at least twice every shift. This generated complications due to its older configuration, which involved a piston rack and, for each adjustment made, caused a 30-minute interruption (on average) to the process. This interruption added up to 2 hours of lost time a day (corresponding to 8.3%).

    Today, after the upgrades were carried out, they are still adjusted twice per shift, but the daily impact is only 20 minutes a day, i.e. an increase of 7% in the equipment’s usage.

  • The third factor was the scheduled maintenance every 4,500 hours; it was time-consuming due to the fact that these older-generation Symons 7’ units have an outdated spring system that doesn’t allow for quick maintenance and the ready freeing of the crushing chamber.

    This problem is common to all mining plants with older-generation equipment. In Chile, there are more than 100 such units operating in different mining plants.

Increased equipment availability and lower exposure to risk for the workers

In light of the above challenges, Metso fully re-engineered and improved the equipment and installed cutting-edge components. “Starting in 2015, a project was carried out to modernize the famous and historic Symons equipment. Its mechanical components and adjustment system were updated, its springs replaced, and the ring adjustment operation automated, which led to the upgrade proposal for the current modernization,” Metso’s Mining Crusher Screens manager Nelson Mella pointed out.

For this particular Symons 7’, modern systems to free up the crushing chamber were used; in terms of securing the chamber, the older Symons technology was upgraded to HP and MP technology.

“By doing this, the advantages include increased equipment availability, lower exposure to risk for the workers, and better product quality control, as the setting can be adjusted more accurately as a result of the motorized setting,” Mella points out.

In addition, a new Hydraulic Power Unit with a PLC was installed, enabling Ethernet connectivity for the existing automation systems belonging to the client or through Metso automation systems (e.g. TC1000, TC2000). This makes it possible to adjust parameters remotely, optimizing the equipment’s efficiency.

The solution was installed by the client over the course of one week in June 2018 under the guidance of Metso professionals. The results:

  • A 31% increase in availability, thanks to less time needed to adjust the unit’s bowl and Closed Side Settings.

  • A reduction in maintenance time and, consequently, a reduced risk of injury. This was achieved by replacing the spring system.

  • The equipment’s setting time was reduced (from 30 minutes to 5 minutes).

  • The bowl removal time was reduced (from 3 hours to 25 minutes), and the adjustment ring removal time was reduced (from 10 hours to 3 hours).

Mining Metals refining

Contact our sales to achieve similar results

Select your industry to open the form.
Mining
Metals refining
Your information is safe. Check our privacy notice for more details.
Thank you!
We will shortly contact you. You can send a new inquiry again after 15 minutes.